ECOFACT Work Packages Update

ECOFACT Work Packages Update

WP2 – Holistic monitoring and data-acquisition solutions

Key achievements:

  • The development of Smart Sensor Prototype is finished
  • Progress in deployment of local platforms at the demo sites
  • The naming exercise for unified naming of signals at the demo sites is finished
  • Progress in development of uniform part of the edge layer

M24 – M30 targets:

  • Deployment and testing of Smart Sensor Prototype at Fraunhofer IWU
  • Finish deployment of local platforms
  • Finish development of uniform part of the edge layer
  • Data transfer to ECOFACT platform from all demos

WP3 – Holistic monitoring and data-acquisition solutions

Key achievements:

  • Modelling of seven production lines for Tofaş
  • Modelling of four production lines for Gullón
  • Integration of the OptimiST tool by RINA-C (industrial energy flexibility) into the Digital Twin Platform (DTP)
  • First integration of the LINKS tool (industrial energy disaggregation) into the DTP
  • First Kafka test to receive real-time data from the Data Broker in Athenian Brewery
  • Development of statistical Predictive Maintenance Model (PdM) based on equipment exponential degradation profile. Model training based on historical data of a similar component to the one to be analysed in AB demo.

Deliverables submitted:

  • D3.8 – ECOFACT Digital Twin Platform (CO)

M24 – M30 targets:

  • Complete the digital twins of the demo sites
  • Finish the development of the energy and resource tools
  • Implement the communication with the Data Broker
  • Generate synthetic data for PdM model based on demos’ experience, and update the developed model accordingly.

WP4Dynamic LCA/LCCA module and value chain data integrations

Key achievements:

  • The Supply chain collaboration service (SCCS) use case for Arcelik has been detailed and a draft deliverable has been prepared (D4.2). The goal of the SCCS is to include dynamic data bout energy and water consumptions from one of Arcelik’s suppliers.
  • LCA/LCC baseline models for all four demos further refined through internal review
  • LCA/LCC baseline models have been adapted with the dynamic assessment in mind, based on which dynamic data points are expected from the field.
  • The approach that will be followed for the sensitivity analysis of LCA/LCC results as part of task 4.4 has been prepared
  • Conference presentations at Global Sustainable Manufacturing Conference and EcoBalance

Deliverables submitted:

M24 – M30 targets:

  • Complete deliverable D4.6 in which the methodological approach and modelling decisions made for the LCA/LCC models will be documented, along with baseline LCA/LCC results (D4.6)
  • Perform and document sensitivity analysis (D4.5)
  • Clarify and implement use case for AHP algorithm (D4.4)

WP5ECOFACT platform and ICT framework development

Key achievements:

M24 – M30 targets:

  • Refinement of the ECOFACT common data model to promote interoperability among the ECOFACT components
  • Interconnection of all the pilot sites with ECOFACT platform components, through the Data Broker, for real-time and historical data
  • Release of new versions of the DSS and of the UI/Dashboard
  • Implementation and test of the applicable safeguards and release of a final safe by design architecture
  • Start of the integration of the components of the ECOFACT platform

WP6 – Demonstration

Key achievements:

  • Monitoring Software & Sensors in acquisition;
  • Building-up of a factory hub for unified external access;
  • Implementation of MQTT – interface in Plant Simulation;
  • Excel template provided to all demos related to monitoring hardware to be purchased (potential dates of purchasing & delays).

M24 – M30 targets:

  • Installation of smart sensors
  • Adaption of Digital Models – Test of eniBric module for E3 factory;
  • Update of time framework for the new equipment to be purchased;
  • DSS requirements (e.g., potential models related to energy flexibility);
  • Monitoring plan in line with Dashboard and KPIs to be evaluated.

WP7 – Standardization, certification and regulation of energy efficient manufacturing

Key achievements:

  • Identification of the main standardization technical bodies related to ECOFACT Project at European and international level;
  • Standards mapping to different WP in the project;
  • Identification on barriers/obstacles, in complying with regulatory instruments on Energy Efficiency (EE) and Life Cycle Sustainability (LCS);
  • Definition of a first approach for a third-party certification scheme for a Sustainable Manufacturing Management System (SmMS),

Deliverables submitted:

M24 – M30 targets:

  • Interaction with standardization system
  • Analysis of standardization potential of ECOFACT results
  • Definition of a Sustainable Manufacturing Management System (SmMS) (Requirements and KPIs)

WP8 – Replication and Exploitation

Key achievements:

  • Update of the list of Key Exploitable Results (KERs)
  • Technology Readiness Level (TRL) assessment of Key Exploitable Results (KERs)
  • Prioritization of Exploitable Results
  • Preliminary definition of Intellectual Property Rights (IPRs) protection measures and intentions
  • First Exploitation workshop

Deliverables submitted:

  • D8.6 First ECOFACT Exploitation Plan: KERs characterized and IPR manual (CO)

M24 – M30 targets:

  • Start of feasibility studies in Early Adopter industrial cases
  • Start of the impact assessment of the ECOFACT approach from a replication perspective
  • Start of elaboration of exploitation paths and business models
  • Further characterization of the results selected during the workshop and start of risk analysis